Power plant shutdown work protocol

           POWER PLANT SHUTDOWN WORK PROTOCOL DAMPER OVERHAULING WORKS SN. LOCATION QUA-NTITY BEARING CLEANING/ REPLACEMENT LINK ROD CLEANING/REPLACEMENT DAMPER FLAP REPAIR GEAR BOX SERVICING LOCKING ARRANGEMENT FLAP SAEL CONDITION FINAL TRIAL SPARES USED REMARK 1 RE – HEATER SUPER HEATER DAMPER 02 ALL BEARING CLEANIG DONE   CLEANING WORK DONE 07 FLAPS - FLAP GAP ADJUSTED OK YES 12MM GALND ROPE, M2 GREASE Stuffing box repaired, New gland replaced 2 RE – HEATER DAMPER 02 ALL BEARING CLEANIG DONE CLEANING WORK   DONE 08 FLAPS - FLAP GAP ADJUSTED OK YES 12MM GALND ROPE Stuffing box repaired, N...

Damper overhauling protocol

  SHUTDOWN OF POWER PLANT DAMPER OVERHAULING PROTOCOL Protocol on dampers work     DAMPER LIST S NO . DAMPER NAME NO. OF DAMPER NO. OF FLAPS PER DAMPER 1.       Re – heater super heater damper & flue gas damper (11000*9000) 02 12 2.       Re – heater damper flue gas (11000*7000) 02 10 3.       ESP inlet / outlet damper (2900*3400) 16 04 4.       Secondary air Damper wind box connecting (2014*1900) 20 04 5.       APH inlet Damper Cold PA (4100*3500) 02 04 6.       APH inlet Damper Cold SA (6039*4500) 02 06 7.     ...